Nashville Downtown Riverfront Greenway

Along with the master plan and construction documents for this prominent greenway along the west bank of the Cumberland River, HPI also developed a series of interpretive signs and trailhead maps.

This greenway corridor is rich with history including: existing stone foundations along the bluff from the 1880s; abandoned rail lines from the 1930s; Trail of Tears crossing in the 1830s; an abandoned streetcar power house; and two historic river wharf sites.

Metropolitan Board of Parks and Recreation
Nashville, TN

Project Thumbnail Project Thumbnail Project Thumbnail Project Thumbnail
Project Image
 
© 2014 Hawkins Partners, Inc.
105 Broadway, Suite 100  •  Nashville, TN 37201
(615) 255-5218  •  (615) 254-1424 fax  •  info@hawkinspartners.com